Buying for resale

Distributor and Wholesale Buying Guide

Distributors do not buy furniture — they buy a repeatable margin. This guide explains how our wholesale programme is structured: per-model minimums, mixed containers, quantity price breaks, private-label branding and the planning rhythm that keeps a resale line in stock without dead inventory.

A wholesale relationship fails for boring reasons: a container that is 60% one model nobody asked for, branding quoted as a special case every single order, and a factory that treats the second order like a new customer. This guide sets out how we structure resale supply so the second order is easier than the first.

We manufacture for distributors and dealer networks in more than 40 countries. The mechanics below are the same ones published on our trade terms page — restated here from the resale point of view, because what matters to a distributor is not the minimum but the margin structure around it.

If you are reselling into a specific vertical — municipal, campus, hospitality — the other guides in this section show what your end buyer will ask for.

How the wholesale programme is structured

Three rules define the programme. They are deliberately simple, because they are what you will plan stock against:

  • Minimums are per model, not per order. 20 pcs on most builds, 5 pcs on selected models — the figure is printed on each product page. A mixed programme does not need 200 of anything.
  • Mixed containers are the normal case. Benches, bins, planters and racks combine in one load; packing is designed around the container, so a distributor can cover several product lines in a single shipment.
  • Price breaks are per model. Each model has its own quantity tiers, quoted with the offer — which lets you build margin on the volume SKUs and carry the long tail at one-container quantities.

Private label and branding options

Branding is a production capability here, not a favour. On custom runs from 50 pcs per model we can apply:

Branding elementHow it is appliedWhat we need from you
Your brand name on plaquesEngraved or cast nameplates replacing oursArtwork and fixing preference
Laser-cut logosCut into steel panels and framesVector artwork
Any RAL colourPowder-coat matched across the rangeRAL code or a physical colour standard
Product configurationLengths, opening splits, accessory modulesA drawing or a written spec — we return a feasibility note
Packing and marksBuyer-specified carton marking for onward distributionMarking instructions with the order

Send the brand guideline before production; we return a colour and artwork proof for sign-off first.

OEM from customer drawings is covered on our custom and OEM page, including the pre-production sample that goes out before the bulk run.

Repeat orders and annual planning

The economics of resale are made in the second and third year, not the first container. Two planning habits make that work:

  • Forecast the top sellers. Give us a rolling view of which models move and in what order sizes; production and coating batches can then be planned so lead time shortens for the models that actually earn the margin. Lead time is confirmed per order at quotation.
  • Plan the long tail at container level. Slow models do not need to meet volume tiers — they ride along in the mixed container. Dead inventory is usually created by over-ordering the tail, not the head.

Consumables and wear parts — slat replacement sets, bin liners, fixing kits — are quoted per project; raise them when you set up the line rather than assuming an off-the-shelf parts programme.

Container planning across product lines

Mixed containers are where a wholesale programme either compounds its margin or loses it to freight. Three practical rules from distributor shipments:

  • Balance the load, not the order. Benches nest and slats pack flat; bin bodies stack inside each other; planters nest where the profile allows. The models with the best cube efficiency subsidise the awkward ones — ask for the loading plan at quotation, per our shipping notes, and re-balance the model mix while it is still a spreadsheet decision.
  • One programme, one finish system. Models ordered in a single RAL powder-coat system consolidate coating batches — that shortens production and keeps the range visually coherent on your floor.
  • Reorder at container economics, not box economics. The second order of a top seller is cheaper in every way when it consolidates into a planned mixed container instead of a rushed partial shipment. Forecasting the top sellers is what makes that possible — the planning rhythm above.

The ranges mix naturally in one programme: park benches and picnic tables for the public-space side, litter bins and recycling stations as the always-moving SKUs, and planters and bike racks as the differentiation lines most distributors under-buy.

After-sales, warranty and the resale relationship

Resale lives or dies on what happens after the first container lands, so the service structure is worth knowing before you commit:

  • Warranty flows through you. Our warranty terms cover the structural product; as the reseller you hold the customer relationship, and we stand behind you with parts and documentation — warranty claims are handled against the order, not against your customer individually.
  • Wear parts are quotable. Slat sets, liners, fixing kits and touch-up paint are quoted per project; setting up a standing spares assumption with the first order turns season-two service into a reorder line instead of a custom negotiation.
  • Documentation follows the shipment. Packing lists, loading plans and pre-shipment photo records are issued per order — the same records your end buyers will ask you for.
  • Escalations reach engineering. Because you buy factory-direct, a product question goes to the people who built it, not to an import desk. That is the practical difference between a trading relationship and a supply one.

What to send for a first wholesale quote

  1. A candidate model list with estimated annual volumes — the tier structure matters more than the first order size.
  2. Your market: which of the buying situations in this section your customers sit in, so we quote the right documentation set.
  3. Branding intentions — even "ours, eventually" — because colour and plaque decisions are cheapest to make before the first run.
  4. Destination port and freight preference, so the quotation lands FOB or CIF correctly the first time.

We reply with a costed quotation, the per-model tier structure and the trade-terms sheet. Sample units can be arranged before the first container — the sample route is described on our trade terms page.

Where to go next

Frequently asked questions

What is the minimum order for wholesale buyers?+

Per model, not per order: 20 pcs on most builds and 5 pcs on selected models, printed on each product page. Mixed models share one container, so a resale programme covers several lines in one shipment.

Do quantity price breaks exist, and how are they structured?+

Yes — each model carries its own quantity tiers, quoted with the offer. The tiers are per model because production and coating costs move differently across the range.

Can we sell under our own brand?+

Yes. Engraved or cast nameplates, laser-cut logos, any RAL powder-coat colour and buyer-specified carton marking, on custom runs from 50 pcs per model. We return a colour and artwork proof before production.

How does the repeat-order process work?+

Same model, same finish, same terms — the re-order is confirmed against the standing quotation structure. Send forecast volumes and production batches are planned to shorten lead time on your top sellers.

What commercial terms apply to wholesale orders?+

FOB or CIF quotation, 30% deposit with the balance against the bill of lading copy, and a pre-shipment photo record issued to you before loading. Alternatives such as staged payments can be raised at quotation stage.

Send your schedule, get a costed BOM

Send the schedule of items, quantities and finish requirements. Our engineers review it, flag anything a factory cannot quote as written, and reply with a specification and price within one working day.

Request a Quote