Logistics

Shipping and Delivery

Public furniture is bulky, heavy and easily damaged in transit. Packing is designed around container utilisation and around the person who has to unload it at the other end.

Freight is usually the second-largest line in a public-furniture budget, after the furniture itself. The two variables that move it most are how densely a container loads and how much damage happens between the factory gate and the site.

This page covers the Incoterms we quote, how each product type is packed, what documents travel with the shipment, and what the receiving site needs to have ready.

Incoterms we quote

We quote FOB (buyer nominates the forwarder; we deliver to the port and load) or CIF (we arrange freight and insurance to your destination port). Both are quoted per project; we do not publish freight rates because they move with the sailing schedule.

Whichever term applies, responsibility for unloading at destination sits with the receiver unless a delivery-to-site service is quoted separately.

Container loading by product type

Product typePacking methodWhat it means for you
Park benchesFrames nest; slats pack flat in bundlesHighest density of the range; slat bundles are the last thing to load
Picnic tablesTop and frame separated, bracedNeeds two people to reassemble; fixings bagged per table
Litter bins and recycling stationsBody nested, liners and lids boxed separatelyLiner boxes are easy to lose — check the packing list against the box count
PlantersNested where the profile allows, else cratedTapered planters nest well; square planters ship crated
Bike racks and bollardsBundled by model, hardware boxedAnchoring kits ship separately from the units they belong to

Units per container are confirmed per model from the packing list; we do not publish per-model loading estimates until that data is confirmed.

Transit times by destination

Transit is a chain of three legs, and each leg is determined by different parties — which is why we state transit on the quotation rather than publishing a fixed table:

LegWhat determines itWhat we commit at quotation
ProductionModel mix, finish, galvanizing scope, seasonThe production window for your order — Pending factory confirmation as a standard figure
OceanPort pair, sailing frequency, carrier schedule, seasonA transit estimate from the carrier booking, not from a published table
Inland at destinationHaulage distance, port congestion, unloading arrangementsQuoted via your forwarder, or as a delivery-to-site line where offered

Ocean schedules move with the season, so a destination table on a website would be out of date before it was indexed — the quotation is the source of record.

Documents and customs

The shipment travels with a commercial invoice, packing list, bill of lading and certificate of origin. Where the destination requires it, we provide fumigation or heat-treatment certification for timber packaging, and material certificates for the steel grades used.

Buyers importing for the first time should confirm the destination's tariff classification for each product type before the order is placed — the classification drives duty, and it is easier to correct on a quotation than at the port.

Receiving and unloading

A container of benches is heavy and the load is not palletised for forklift access in every case. Confirm before arrival that the site has a forklift or a crane with the right capacity, or that the container can be unloaded by hand in bundles.

Inspect on arrival, before signing: photograph any crushed carton, bent frame or missing bundle, and note it on the delivery receipt. Damage noted after the container leaves the site is difficult to attribute and therefore difficult to claim.

Installation and anchoring

Fixing method is decided by the substrate, not by the product: surface-mounted base plates with expansion anchors suit existing paved slabs, while embedded legs set into new concrete footings resist levering and suit lawns. Both kits ship with stainless fasteners.

For a written comparison of the two methods by substrate type, see our anchoring specification guide.

Frequently asked questions

How long does delivery take from China?+

The production window is confirmed per project at quotation stage — we do not publish a standard figure. Sea transit is quoted separately and depends on port pair and sailing schedule, so the figures that apply to your order are stated on the quotation.

Can you deliver to site rather than to port?+

CIF delivery is to the destination port. Delivery to site, including inland haulage and unloading, can be quoted as a separate line where the destination has a reliable haulier.

How are benches packed?+

Frames nest and slats pack flat in bundles. That gives the highest container density in the range and keeps the slat bundles accessible for unloading.

What documents come with the shipment?+

Commercial invoice, packing list, bill of lading and certificate of origin. Fumigation or heat-treatment certification for timber packaging, and material certificates for steel grades, are provided where required.

Who unloads the container?+

The receiver, unless delivery-to-site with unloading is quoted. Confirm forklift or crane capacity before arrival — a container of benches is not a hand-unload job in every configuration.

Send your drawing, get a costed BOM

Tell us the site, the quantity and any dimensional constraint. Our engineers reply with a specification and price within one working day.

Request a Quote