2026-11-13

Recycling Station MOQ: How Minimum Orders Are Counted

Recycling station MOQ explained: per-model minimums, what colour or artwork changes add, how mixed containers help, and what to send for a quote.

Recycling Station MOQ: How Minimum Orders Are Counted

Recycling station MOQ is counted per model and per configuration, not per project and not per compartment. One three-stream station is one unit; a change of body colour, panel artwork or stream count opens a new production line with its own minimum. On the three catalogue stations currently listed, the printed opening band starts at 20 pieces per model, and custom stream counts or artwork start at 50 pieces per model. Everything else about the minimum is a loading and configuration question, and this article shows you how to work it.

Quick answer: catalogue recycling stations carry a per-model MOQ printed on each product page — the opening quantity band on all three current stations is 20 pcs per model, per configuration. Changing colour, artwork or stream count creates a second line with its own minimum. Custom runs start from 50 pcs per model. Mixed models share one container, each model meeting its own minimum.

What counts as one unit

The first thing buyers get wrong is the counting unit. A minimum order quantity on a recycling station is quoted in stations, not in compartments or liners:

  • A two-stream station is one unit even though it has two apertures, two doors and two liners inside. The frame is welded and coated as one body, so the production batch is counted in complete bodies.
  • A three-stream station is also one unit. Forty three-stream stations mean forty bodies and one hundred and twenty liners — but the MOQ you negotiate is forty, because that is what fills the coating line and the container.
  • Spare liner sets are an accessory line, not part of the minimum. If you want one spare liner per stream for maintenance, that rides along with the stations rather than adding a second minimum to negotiate.

This matters when a tender is written in "sorting points": ninety points across a campus is thirty three-stream stations — one line, one minimum — not ninety of anything. Confirm the unit before comparing quotes; a supplier counting in compartments returns a very different document from one counting in stations.

The printed minimum on this line

The catalogue-wide rule is a per-model minimum from 5 pcs on selected builds, with the exact figure printed on each product page rather than issued as a house rule. On the three recycling stations currently listed, each goes through a colour-and-artwork setup per batch, and the printed opening band is 20 pcs per model:

ModelStreamsDimensions, W × D × H (mm)Opening quantity band
Duotone classified bin2800 × 420 × 95020 pcs per model
Trisort triple sorting bin31290 × 400 × 105020 pcs per model
Triovista triple station31500 × 450 × 100020 pcs per model

The quantity band then steps down again at 100 and 300 units, with unit pricing inside each band quoted on request. Always read the figure on the product page for the model you are specifying — see the Duotone classified bin, the Trisort triple sorting bin and the Triovista triple station for how the bands are presented. The full line, with each model's printed minimum side by side, is on the recycling station category page.

What opens a second counting unit

This is where recycling-station MOQ differs from a plain litter bin order. A station is specified per configuration, and every configuration variable below creates its own production line — each one carrying the per-model minimum again:

Configuration changeHow it is countedPractical effect
Body colour (RAL) changed within a modelSeparate coating batchOwn per-model minimum for that colour
Panel artwork, icons or stream names customisedArtwork proof + new panel productionOwn minimum per model per artwork set
Aperture shape changed (round hole ↔ slot)New top tooling and fixtureOwn minimum per model per aperture set
Stream count changed (2-stream ↔ 3-stream)Different model, different frame layoutOwn minimum as a separate model
Spare liners or keys orderedAccessory lineNo separate minimum; ships with the stations
Several models ordered togetherEach model meets its own minimumOne container, one freight cost, one customs entry

The last two rows are the levers most buyers underuse. Accessories never block an order, and model mixing means thirty stations, twenty benches and a dozen planters ship as one order against one set of per-model minimums. The container-loading method in our OEM packing guide shows how mixed cargo reaches the minimums together.

Where 5 and where 50

Two other numbers sit around the per-model figure:

  • From 5 pcs is the lowest per-model minimum, available on selected catalogue builds across the wider range; whether your model qualifies is printed on its product page.
  • From 50 pcs per model is where a custom run starts: a stream count we do not list, artwork built from scratch to your city scheme, or a non-standard body. The threshold covers drawing approval, artwork proofing, fixture setup and first-article inspection before the line runs. The route is described in our custom recycling station manufacturer guide.

Holding the minimum down on a small project

Your situationRecommended routeWhy
12 stations for one campus retrofit, all the same schemeOne model; round the order up to the 20-piece bandCheaper than two partial lines; surplus units phase into next year's budget
8 stations across three colour-coded zonesStandardise body colour; zone by panel artwork insteadThree colour lines would mean three minimums; panels carry the zoning
30 stations split across two different stream schemesCount lines, not stations — two configurations are two minimumsConsider one estate-wide scheme; consistency also reduces contamination
Order below any per-model minimumAdd litter bins, benches or planters to share the containerMixed loading lets every line reach its own minimum in one shipment

The colour-zone row deserves emphasis. Because coating runs in batches, buyers often multiply the budget by the number of zones. On a station the visible zoning work is done by the panels and apertures, which are produced per artwork set anyway — one body colour with three panel sets is frequently the smaller order.

Price inside the bands, and how to compare quotes

Within each band the unit price is quoted on request, so ask what quantity every quoted price assumes: a price computed at 100 units is not comparable to one computed at 20, whatever either supplier's minimum says. When reviewing quotations, check the model and configuration each line covers, the quantity it assumes, and whether artwork proofing is billed separately. Our park bench MOQ article covers the same discipline for seating.

One more check belongs in every station quotation: capacity per stream, not total volume — stations fail on the stream that fills first. Work through the usable-liner method in our capacity planning reference before fixing the split between compartments; we do not print litre figures until the factory confirms them for your configuration.

What to send us for an MOQ and quantity quote

A recycling station MOQ question turns into an exact answer once we know the configuration split. Send:

  1. Model name or product-page link — or a reference photo if you are benchmarking another supplier's station.
  2. Stream count and stream names per site, so we can tell whether you are ordering one configuration or several.
  3. Quantity per configuration, even a rough split ("30 × three-stream, 10 × two-stream").
  4. Colour scheme — catalogue finish, or RAL codes if your city scheme specifies them.
  5. Artwork status — catalogue panels, or your scheme document with icons and stream names for a proof.
  6. Destination city and nearest sea port, so container fill and freight are calculated, not guessed.
  7. Programme date — when the stations must be installed, so production and sea freight are planned backwards from it.
  8. Project type and stage — municipal tender, campus estate or distributor stock, which changes the paperwork we attach to the quote.

With those eight items we reply with a per-model minimum confirmation, a banded quantity price, and a container loading plan in one pass. If you are still sizing the stations themselves, the how many recycling bins do I need method and the recycling station dimensions table sit upstream of this decision, and the complete range is browsable on the recycling station category page.

For most buyers the sequence is short: fix the stream scheme, pick the model, read its printed minimum, and let the container do the rest. Send the checklist above through our contact page and we will return the confirmed minimum, the loading plan and the quote together.

Planning a public-space project?

AOTUDE manufactures park benches, picnic tables, trash bins, recycling stations, planters, bike racks and bollards for municipalities and contractors in 40+ countries. Factory-direct, OEM/ODM, 5–10 year warranty.

Request a Quote

Related reading

Browse the full range: park benches, litter bins, planters, recycling stations.